Capital Improvements Projects (C.I.P.)

C.I.P. are projects funded by the County, or through the use of grant funding. They include the replacement or construction of bridges/culverts, paving and widening of existing roadways and construction of new regional roadway arterials. Paving of existing local residential gravel roads (in old subdivisions where the roads were never built by the developer, or were built but were never accepted by the County for maintenance) are accomplished through the use of Local Improvement Districts administered through the Engineering Division. C.I.P. staff functions with regard to the implementation of Capital Improvement Projects include: surveying, developing conceptual alignment, studies, preliminary and final design, preparation of construction plans and specifications, acquisition of right-of-way, bidding of work and management of construction activities.

More Information

Current Bid Information Available to Contractors

2012 Asphalt Overlay Project - CI 2012-003

Separate sealed bids for the 2012 Asphalt Overlay Project will be received by Douglas County until 2:00 p.m. on Tuesday, May 22, 2012. This project includes the placement of asphalt overlay, patching, pavement marking, and traffic control at various locations throughout Douglas County.

PDF DocumentAddendum Number 1 - dated May 14, 2012

Excel DocumentFor Contractor convenience, an electronic bid schedule is being provided. Bidders shall submit bids in accordance with the Contract Documents and Specifications.


HR TIP - Phase I - 2011, University Blvd. Widening - CI 2011-005

Separate sealed bids for HR TIP - PHASE I - 2011, UNIVERSITY BLVD. WIDENING (Westbound University Blvd. to Northbound Cresthill Lane) will be received by Douglas County until 10:00 a.m. on Tuesday, June 5, 2012. This project consists of construction of a new turn lane with concrete pavement, curb and gutter, as well as sidewalk.  There will also be subgrade preparation, signs, striping and erosion control.

Excel Document For Contractor convenience, an electronic bid schedule is being provided. Bidders shall submit bids in accordance with the Contract Documents and Specifications.


Rocky Mountain Online Bid System»

The Rocky Mountain E-Purchasing System (BidNet®) is an on-line notification system that is being utilized by the State of Colorado. Participating agencies post their bids, quotes, proposals, addendums, and awards on this system.

Active Construction Projects

Road Improvement / Maintenance Projects »

2012 Sidewalk Repair, Asphalt Projects, Surface Treatment and Pavement Project location and schedules.


HR TIP - Phase I - 2011, University Blvd. Widening

As part of the Highlands Ranch Transportation Improvement Plan, Douglas County is preparing to make safety and operational improvements at the University / Cresthill Intersection. The County plans to widen westbound University as it approaches Cresthill Lane in order to provide for a dedicated northbound right turn lane. Congestion, especially during the morning rush hour, can be fairly significant, as rush hour commuter traffic overlaps with trips to both the High School and Middle School, which are located nearby on Cresthill Lane. Construction is anticipated to occur this summer and should be substantially completed before middle of August (before school is back in session).


 

Hess Road Extension Project »

 

 
 