Alert

Stage 1 Fire Restrictions in place for Unincorporated Douglas CountyContinue Reading

Curb and Gutter Repair

Schedule

April 27 – Westbound Lincoln Avenue from Cottoncreek Drive to Laredo Street from 7:30 a.m. to 3 p.m.  The right westbound lane will be closed for this repair which may impede traffic flow.

April 28 – 29 – Eastbound University Boulevard from Teal Ridge Court to Cresthill Lane from 7:30 a.m. to 3 p.m.  The right eastbound lane will be closed for this repair which may impede traffic flow.

May 4 – Highlands Ranch Parkway from Broadway to Ridge Line Boulevard from 7:30 a.m. to 3 p.m. The right westbound lane will be closed for this repair which may impede traffic flow.

 

Project Contact
Public Works Operations
Phone: 303-660-7480
[email protected]