Pine Drive (Lincoln Avenue to Ponderosa Drive) Improvement Project

Project Description

Phase 1 will extend the 4-lane roadway section from Lincoln Avenue to Ponderosa Drive and will include a traffic signal at the intersection of Ponderosa Drive. The benefit of this phase of the project will be to provide increased capacity and safety improvements at the Ponderosa intersection.

Phase 2 (also called Pine Lane Project) will widen Pine Lane from a 2-lane to a 3-lane arterial roadway, and adding a northbound left-turn lane onto Pine Drive. The benefit of this phase of the project will be to provide increased roadway capacity, reduce congestion and travel delay, and improve safety and access for the adjacent schools.

Schedule

Phase 1:

  • 2019: Design, right-of-way acquisition and utility relocates to begin
  • 2020: Construction anticipated to begin

Phase 2:

  • 2019: Design, right-of-way acquisition and utility relocates to begin
  • 2020: Construction anticipated to begin

Contractor
TBD

Project Manager
Bret Banwart, P.E.
303-660-7490