×

01.

Help Me With...

Select from list
My Residential Property
My Driver's License or Vehicle Registration
Requesting Assistance
Elections
Health Department

02.

Select from list
My Property Valuation
Understanding My Valuation
Paying My Property Tax
Neighborhood Sales
Building Permits
Vehicle Registration - New Stickers
Vehicle Registration - New Vehicle
Drivers License - New or Renew
New Resident Vehicle Registration
Adult Protection
Child Welfare
Child Support
Child Care
Financial Assistance
Medical Assistance
Food Assistance
Register to Vote / Update Voter Registration
Upcoming Election Information
Ballot Drop Box Locations
Voter Service and Polling Centers
Birth/Death Records
Restaurant Inspections
Community Health
Child Care Center Inspections
Septic System Inspections
Emergency Preparedness & Response
Disease Surveillance
Mental and Behavioral Health Education
Community Health and Clinical Services
Women, Infants and Children

03.

×
× Close

News

Major I-25 overnight closures at Lone Tree for emergency bridge repairs through June 2021

Full 18-hour northbound closure from 7 p.m. on June 5 to 1 p.m. on June 6, up to two-hour delays expected

Posted on June 1, 2021 2021Transportation

Share

Information provided by the Colorado Department of Transportation

There will be major traffic impacts, mostly overnight, on I-25 in the Lone Tree area south of Denver in June. The Colorado Department of Transportation along with contractor Kraemer North America will replace part of the Sky Ridge Avenue Bridge between Ridgegate Parkway and Lincoln Avenue, over I-25, that was struck by a commercial truck in February.

The most extensive impacts will be in early June when northbound I-25 will be closed for 18 hours from 7 p.m. Saturday night, June 5 through 1 p.m. Sunday, June 6. Two inside lanes of southbound I-25 will also be closed. There are no further anticipated daytime full highway closures, but full overnight closures will continue through many nights in June.

A detour will be in place for northbound travel. Significant delays are expected for both north and southbound. Motorists are urged to avoid traveling in the area during the closures (see schedule and detour map below).

To ensure the structure’s safety, CDOT will replace the portion of the bridge that was damaged. Work will involve taking down part of the structure and completely replacing it with a new girder and bridge deck. In advance of the work, CDOT has closed an auxiliary lane in the project area for staging equipment. All work is scheduled to be finished prior to the Fourth of July holiday weekend.

CLOSURES AND TRAFFIC IMPACTS
Beginning Wednesday, May 19 at 8 p.m. until the project is finished in late June or early July, there will be a 24/7 closure of an auxiliary lane on northbound I-25 between Ridgegate Parkway and Lincoln Avenue. This space is needed for crews to stage equipment for bridge repairs. This closure may cause some minor delays during peak travel periods.

Major closures are as follows. For more details visit the CDOT project page.

Full closures of northbound I-25 from Ridgegate Parkway to Lincoln Avenue, along with double left lane closures on southbound I-25:

Full overnight closures of northbound I-25 to complete the repairs by pouring the concrete deck.  All lanes on southbound I-25 will be open:

When overnight northbound I-25 closures are not in place, there may be nighttime single and double lane closures on northbound and southbound I-25 between Ridgegate Parkway and Lincoln Avenue during June.

Detour (image below): northbound I-25 traffic will use Exit 192/ Ridgegate Parkway and turn right. Continue to Peoria Street and turn left. Proceed on Peoria Street to Lincoln Avenue and turn left. Continue on Lincoln Avenue to the northbound I-25 on-ramp. Park Meadows Mall traffic should exit Ridgegate Parkway and turn left. Continue to Park Meadows Drive, turn right and continue north to Park Meadows Mall.

The schedule above is subject to change depending on weather and other circumstances. Check the info sources below for the latest schedule information and road conditions.

STAY INFORMED
More information is available at:
● Project website: www.codot.gov/projects/sky-ridge-bridge-repair
● Project information hotline: 720-770-0353
● Project email: [email protected]

June 2021 Sky Ridge Bridge Repair Detour Map

Your County. Your News. Get it first.

Be among the first to receive news as it happens. Subscribe to our online news push, and select your specific news focus and delivery preferences. Visit the Live Town Hall page and register for Town Hall notifications to ensure you are contacted to participate in future community conversations about topics important to you. Both services are free, and you can unsubscribe at any time. And don’t forget to follow Douglas County on Nextdoor, Facebook, Twitter, Instagram, LinkedIn and YouTube.

Sign Up Now!