×

01.

Help Me With...

Select from list
My Residential Property
My Driver's License or Vehicle Registration
Requesting Assistance
Elections
Health Department

02.

Select from list
My Property Valuation
Understanding My Valuation
Paying My Property Tax
Neighborhood Sales
Building Permits
Vehicle Registration - New Stickers
Vehicle Registration - New Vehicle
Drivers License - New or Renew
New Resident Vehicle Registration
Adult Protection
Child Welfare
Child Support
Child Care
Financial Assistance
Medical Assistance
Food Assistance
Register to Vote / Update Voter Registration
Upcoming Election Information
Ballot Drop Box Locations
Voter Service and Polling Centers
Birth/Death Records
Restaurant Inspections
Community Health
Child Care Center Inspections
Septic System Inspections
Emergency Preparedness & Response
Disease Surveillance
Mental and Behavioral Health Education
Community Health and Clinical Services
Women, Infants and Children

03.

×
× Close
Building Division

Patio Covers

Patio or deck cover permit requirements

  • Building Permit Application.  If contractors are being used they shall be listed on your application at the time of submittal (Homeowner Agreement Form ).
  • Construction documents.  One set of scaled (¼” = 1’) construction plans on white paper in blue or black ink. Plans shall include:
    • Site plan showing dimensions to property lines and other structures.  NOTE: It shall be the sole responsibility of the property owner and/or permit holder to verify the location of all utilities and easements including water, sewer, well, septic, electric, phone, cable, fiber optic and gas prior to excavation or construction of any structure. 
    • Structural framing plans shall include all dimensions, species, and size of lumber, size, and spacing of caisson footings, posts, beams, rafters, a ledger attachment detail, and type of roof covering.
    • All trusses shall be engineered.
    • Elevation drawings showing complete construction including all exterior elevations
  • Letter from Architectural Control Committee (ACC) (where applicable).  If this letter is not included with your submittal, your permit will be placed “on hold” for five working days to allow notification of the Architectural Control Committee.

Shade structures such as pergolas and ornamental garden structures that are not subject to a uniform snow load are exempt from permit.  All work exempted from permit is subject to applicable zoning requirements and the regulations of other agencies having authority.