01.

Help Me With...

Select from list
My Residential Property
My Driver's License or Vehicle Registration
Requesting Assistance
Getting Outdoors
Elections
Health Department

02.

Select from list
My Property Valuation
Understanding My Valuation
Paying My Property Tax
Neighborhood Sales
Building Permits
Vehicle Registration - New Stickers
Vehicle Registration - New Vehicle
Drivers License - New or Renew
New Resident Vehicle Registration
Adult Protection
Child Welfare
Child Support
Child Care
Financial Assistance
Medical Assistance
Food Assistance
Decode Douglas County
Open Space Special Event Permits
Open Space Properties and Trails
Park Reservations
Parks and Trails
Register to Vote / Update Voter Registration
Upcoming Election Information
Ballot Drop Box Locations
Voter Service and Polling Centers
Birth Certificates
Death Certificates
Environmental Health
Household Waste Management

03.

×
× Close
Public Works

Broadway and Highlands Ranch Parkway Intersection Improvements

Planning/Design

Budget

Anticipated Total Cost = $5 Million

Project Manager

Katherine Haire, PTP
[email protected]

303-660-7490

Partners

  • CDOT (Highway Safety Improvement Program (HSIP) grant funding)

Project Update

Design Plans are underway for extensive improvements at the intersection of Broadway and Highlands Ranch Parkway, to improve the overall safety of the intersection through the addition of a second southbound left-turn lane on Broadway accessing eastbound Highlands Ranch Parkway, and widening Highlands Ranch Parkway through the Broadway intersection to include three (3) eastbound through lanes. In addition, the existing traffic signal will be redesigned to accommodate the wider intersection.

Description

When the design is completed, the initial phase of construction for the Broadway improvements will begin in Spring 2023, utilizing the Highway Safety Improvement Program (HSIP) grant funding approved by CDOT in the amount of $1.125 Million. The County will complete the Highlands Ranch Parkway portion of intersection improvements in subsequent phase(s). Total cost of the intersection improvements is estimated to be approximately $5 Million.

Interim Solution until design/construction is completed:

An interim solution has already been implemented to help improve the Broadway/Highlands Ranch Parkway capacity, reduce delay and improve overall safety for the motoring public, as follows:

  • Traffic signal heads were swapped out for northbound, southbound, and westbound directions, to upgraded ‘three-section left-on green arrow only’ signal heads. These upgrades will help to address left turn accident patterns at this very busy intersection.
  • Traffic signal timing was also adjusted to accommodate prevailing traffic volumes.
  • Existing gore pavement markings were removed to open a new second left turn lane pocket for westbound Highlands Ranch Parkway to southbound Broadway.
  • Signs and pavement markings were upgraded to advise drivers of improvements including the R3-8 Double Left Turn sign installed on the mast arm and two left-turn arrows on the roadway.
  • Additionally, channelizer lines and double yellow lines were refreshed with paint to complete this transformation.

Schedule

Estimated Timeline for Design and Construction:

  • Preliminary Intersection Design:  Summer 2022
  • Final Design:  Fall/Winter 2022
  • Broadway Construction:  Spring 2023
  • Highlands Ranch Parkway Construction:  2024