Posted May 6, 2025
Construction is anticipated to start in June of 2025.
Under Construction
Posted May 6, 2025
Construction is anticipated to start in June of 2025.
Douglas County’s 2025 concrete repair program includes repairs on Gleneagles Village Parkway. Work consists of sidewalk repairs, curb ramp upgrades, and roadway panel replacement. Work will be performed by the County’s sidewalk repair contractor. Repairs will take between 1 and 2 weeks.
During construction, access to driveways will be available, with occasional short delays. One to two days before the start of work, variable message boards will be placed at each end of the project to notify drivers of the planned work.
Two days before the start of work, no-parking signs will be posted along the street. Construction will be done Monday through Friday between 7 a.m. – 7 p.m.