Pothole Patching

Project Overview
Freeze-thaw cycles during winter and spring months accelerate pothole creation on our roads. Pothole patching is already underway. To repair potholes and avoid traffic congestion, pothole patching by Douglas County occurs using mobile equipment.  These repairs will result in a safer and smoother ride quality for motorists and help preserve the existing road surface.

Schedule

Ongoing  – Pothole patching will occur throughout the winter and spring months, as weather permits, on weekdays from 9 a.m. – 2:30 p.m. on main arterial routes which include Quebec St., University Blvd., Highlands Ranch Parkway, County Line Rd., Lincoln Ave., Wildcat Reserve Parkway, and Broadway.

Project Contact
Public Works Operations
Phone: 303-660-7480
pwoperations@douglas.co.us