01.

Help Me With...

Select from list
My Residential Property
My Driver's License or Vehicle Registration
Requesting Assistance
Getting Outdoors
Elections
Health Department

02.

Select from list
My Property Valuation
Understanding My Valuation
Paying My Property Tax
Neighborhood Sales
Building Permits
Vehicle Registration - New Stickers
Vehicle Registration - New Vehicle
Drivers License - New or Renew
New Resident Vehicle Registration
Adult Protection
Child Welfare
Child Support
Child Care
Financial Assistance
Medical Assistance
Food Assistance
Decode Douglas County
Open Space Special Event Permits
Open Space Properties and Trails
Park Reservations
Parks and Trails
Register to Vote / Update Voter Registration
Upcoming Election Information
Ballot Drop Box Locations
Voter Service and Polling Centers
Birth Certificates
Death Certificates
Environmental Health
Household Waste Management

03.

×
× Close
Public Works

Stonegate Neighborhood Paving Projects

Roadway

Project Manager

Keith Burke, Inspector
[email protected]

303-947-8720

Contractor

Martin Marietta Materials, Inc.
[email protected]

Project Update

Milling and Paving work in August 2022:

Weeks of August 1 – 12, 2022: Milling and paving on: Stoneledge Drive, Maple Rock Court, Sweet brush Drive, Hedge Lane, Autumn Rock Cove, Amberstone Way, Rockledge Cove, Amberstone Way, Parkside Drive, Saranac Way, Kennemere Lane, Bordeaux Court, Kettering Lane, Crimson Court, E Celestine Court, E Cornerstone Drive, E Cornerstone Lane, E Gypsum Court, E Opal Hill Drive, E Rock Brook Boulevard, S Amethyst Way, S Celestine Place, S Gemstone Court, S Riverstone Drive, S Sweet Rock Court, S Topaz Circle, and S Turquoise Court will have intermittent lane closures for road construction between the hours of 7 a.m. and 7 p.m.

Description

The 2022 neighborhood street paving program in Stonegate includes streets carried forward from 2021. See the 2022 Neighborhood Street Paving Map for specific locations.

On each street, work will be done in three phases – the first phase consists of sidewalk repairs and curb ramp upgrades, which will be performed by the County’s sidewalk repair contractor Chato’s Concrete. Sidewalk repairs will begin after March 15 and will usually take between 2 and 4 weeks per neighborhood; work on a single block will generally take 3 to 4 days. The second phase will take place later in the summer and consists of rotomilling to remove some of the top layer of asphalt, which generally takes 2 to 4 hours or less per block to complete. The final phase follows rotomilling by 1 to 2 weeks and includes placing the new overlay; this last phase may take 4 – 8 hours to complete.

During construction, access to driveways is allowed, with occasional short delays. If the sidewalk contractor needs to replace the walk in front of your driveway, they will notify you so you can move your vehicles before the work is done.

1 to 2 weeks before the start of sidewalk repairs, the County will send Cone Zone Mailers to notify adjacent residents of the planned work. Cone Zone Mailers will also be sent 1 to 2 weeks before the start of rotomilling.

1 to 2 days before the start of each phase of work, the Contractor will deliver a Cone Zone door hanger with the date of the start of that phase of work on your block.

Two days before the start of rotomilling and paving, no-parking signs will be posted along the streets scheduled for work. Construction will be done Monday through Friday between 7 a.m. – 7 p.m.

Sidewalk Contractor
Chato’s Concrete
Phone: 720-252-7959

Asphalt Contractor
Martin Marietta Materials, Inc.
[email protected]

Note:  If your vehicle was towed because it was left in the construction zone, please contact Westside Towing at 303-688-5244 for information on where your car was towed.

Schedule

  • Sidewalk Repairs were completed in May 2022.
  • Milling and Paving will occur in August 2022.

Project Manager
Keith Burke
[email protected]
303-947-8720