Alert

In observance of Memorial Day, County offices will be closed Monday, May 30. For online services, visit our web page.

×

01.

Help Me With...

Select from list
My Residential Property
My Driver's License or Vehicle Registration
Requesting Assistance
Getting Outdoors
Elections

02.

Select from list
My Property Valuation
Understanding My Valuation
Paying My Property Tax
Neighborhood Sales
Building Permits
Vehicle Registration - New Stickers
Vehicle Registration - New Vehicle
Drivers License - New or Renew
New Resident Vehicle Registration
Adult Protection
Child Welfare
Child Support
Child Care
Financial Assistance
Medical Assistance
Food Assistance
Decode Douglas County
Open Space Special Event Permits
Open Space Properties and Trails
Park Reservations
Parks and Trails
Register to Vote / Update Voter Registration
Upcoming Election Information
Ballot Drop Box Locations
Voter Service and Polling Centers

03.

×
× Close
Public Works

US 85 widening from two to four lanes between Louviers and Milepost 191.75

Roadway

Project Manager

Art Griffith, P.E.
[email protected]

303-660-7490

Contractor

CDOT
[email protected]

720-356-4440

Project Update

See updated Schedule below.

Work began on July 6, 2021, and the estimated finish date is July 2022. Most work will take place from 7 a.m. to 7 p.m. during the weekdays, with some night and weekend work possible.

Travel Impacts:

● Motorists will begin to see construction activities on the east side of US 85.
● There will continue to be one lane open in each direction during construction.
● During the course of the project, there will be occasional lane closures that shift traffic to a single lane in each direction.
● There will be shoulder closures at times.
● There could be delays of 5 to 10 minutes.
● The speed limit will be reduced to 45 mph through the work zone with possible reductions to 40 mph when flaggers are present.
● Motorists are urged to heed the speed limit and drive carefully.

For more information visit codot.gov/projects/us85-widening-louviers

Description

Construction is underway to widen and improve US 85 between Sedalia (SH 67) and Louviers in Douglas County. The project will ease congestion, improve access to side streets and left-turn lanes, improve drainage, enhance safety, add wildlife fencing and build a new bridge. The project is scheduled for completion in July 2022.

Schedule

Listed below are the traffic impacts and road work to expect this upcoming week of May 23-27 for the US 85 Widening project:

  • Inside lanes for both directions of US 85 will be closed for median work activities.
  • For US 85, northbound and southbound, there will be various shoulder closures from Sedalia to Titan Road for deer fencing and roadway grading.
  • Also, there will be intermittent traffic stops just south of Airport Road near mile marker 193 for equipment crossings. There will be flaggers to direct traffic.
  • Weather permitting, work will take place Monday through Friday, 7 a.m. to 5 p.m.

Generally, please be prepared for delays. Due to weather conditions, the road work schedule is frequently adjusted.

For the current work schedule and anticipated lane closures please visit www.codot.gov/projects/us85-widening-louviers

Project Manager
Art Griffith, P.E.
[email protected]
303-660-7490