2018 Pavement Management Projects

Click on the map below to open the interactive application.

 

The following is a list of the 2018 Contracted Maintenance of Condition Projects.  For questions please contact the indicated Project Manager listed for each project.

2018 Sidewalk Repair and Curb Ramp Retrofit Project
The 2018 Sidewalk Repair and Curb Ramp Retrofit Project consists of curb, gutter and sidewalk repairs, curb ramp retrofits, and traffic control at various locations throughout Douglas County. Construction is scheduled to begin in March and run through July. The project will repair 38,500 feet of curb, gutter and sidewalk, and 726 curb ramps.  If you have any questions please contact Keith Burke at SidewalkRepair@douglas.co.us

2018 Surface Treatment Project
The 2018 Surface Treatment Project consists of crack sealing and chip sealing at various locations throughout Douglas County.  Crack sealing will occur in the spring and fall; chip sealing will be done between Memorial Day and Labor Day.  Twelve miles of streets will be seal coated as part of this project.  If you have any questions please contact Dan Roberts at SurfaceTreatment@douglas.co.us

2018 Concrete Pavement Repair Project
The 2018 Concrete Pavement Repair Project consists of concrete street reconstruction on Meridian Boulevard from Maroon Circle to Belford Avenue, and concrete panel repair at various locations throughout Douglas County.  Work includes pavement marking and traffic control.  Construction is scheduled to begin in March and be completed by September.  If you have any questions please contact Brian Schultz at ConcPavementRepair@douglas.co.us

2018 Asphalt Overlay Project
The 2018 Asphalt Overlay Project consists of asphalt resurfacing, pavement marking and traffic control in various locations throughout Douglas County.  Construction is scheduled to begin in July and run through October.  Forty-five miles of streets will be resurfaced as part of this project.  If you have any questions please contact Keith Burke at AsphaltOverlay@douglas.co.us

 Highlands Ranch Road Improvements