RidgeGate Widening

Project Description

The City of Lone Tree will widen RidgeGate Parkway to provide two additional thru-lanes in each direction (between I-25 and Meridian Village Pkwy), building new bridges over Badger Gulch and Happy Canyon Creek, installing 8-foot wide sidewalks (pedestrian) and a 12-foot wide cycle track (bicycles) along this corridor. A portion of the Project will utilize a split alignment.

This Project is split into two phases. Map of RidgeGate Parkway expansion

  • Phase 1 includes the two bridges and some earthwork.
  • Phase 2 includes the remaining roadway expansion and is expected to be substantially completed by Spring 2021.

Schedule

Construction began in April 2019 and is anticipated to be substantially completed in Spring 2021.

Project Manager
City of Lone Tree