US 85 / Titan Interchange Improvements

Project Description

Douglas County is working with CDOT to get final environmental approval and other CDOT permits to allow the County to widen the northbound US 85 on-ramp and restripe Titan Road over US 85 in order to improve safety and traffic operations.  CDOT has completed their review of the design plans in 2020.  Douglas County recently hired a consultant to perform the required subsurface utility engineering investigation and we are currently in the process of assessing if there are any major utility conflicts with the proposed design.

Schedule

Currently, Douglas County staff anticipates construction to being in spring 2021 and completed in early fall 2021.

Contractor

TBD

Project Manager

Art Griffith
[email protected]